And so it begins

Perhaps the most important pieces of the puzzle are the data pack and the forward closures. Currently, I only have one set of closures but a second set is planned for backups in case of any problems.

Next to the forward closure, the injector plate and pin valves are the next critical components. The injector plates will require fabrication by a machine shop but the pin valves can be modified from standard paint ball pin valves. They will require drilling out, reprofiling of the threads, and modifying the pin itself. More to come in the next post.